Center for Oncology - Cho Ray Hospital
SAGOMED is honored to be the contractor for construction of the medical gas system for the project of Cancer Center - Cho Ray Hospital.
Name of project: Building Cancer Center - Hospital Market
Owner: Cho Ray Hospital
Location: 201B-Nguyen Chi Thanh, Ward 12, District 10, Ho Chi Minh City.
Scale works:
- The treatment room consists of 12 floors, 01 mezzanine, 02 basements.
- Total floor area: 21,416 m2.
- Area of 02 basement floors: 4,096 m2.
- Building height: 56.7m.
- Bored pile foundation D 400, D 1000, D 1200 depth 70m.
- Framed concrete frame.
- The project is designed with 250 boarding beds, the same HVAC system, ventilation, light electric system, medical gas system and 05 synchronous elevator, modern.
Created By: admin
Created Date: 5/26/2017